Tally Ho blocks often sit on clay soils and sloping sites near Ringwood, so getting levels, drainage and moisture barriers right before the pour is critical to avoid future cracking and damp problems.
Answer a few quick questions to receive your personalised quote for Tally Ho
Complete this step to continue
Our comprehensive service includes everything you need to make an informed decision about your property.
We visually assess whether the slab platform looks properly prepared and consistent, including areas around edge beams and internal beams. Poor preparation can lead to soft spots and differential movement after handover, so we document concerns early while rework is still possible.
We check formwork alignment, bracing and the way beams and rebates are set out where visible. If forms are out of line or poorly supported, you can end up with an uneven slab edge, incorrect dimensions for frames, and avoidable finishing and drainage issues.
We review the placement of reinforcement, overlaps where visible, and whether steel is appropriately supported to maintain cover within the concrete. Steel sitting too low, too high, or on the ground can reduce slab performance and increase the chance of cracking or corrosion-related issues.
We inspect the membrane for punctures, tears, incomplete laps and poor taping, including around edges and penetrations. In Melbourne’s wet winters, a compromised barrier can allow ground moisture into the slab, contributing to dampness, flooring failures and mould risk.
We check that penetrations appear positioned sensibly and are detailed to reduce movement and moisture pathways. Poorly placed or inadequately protected penetrations can become leak points or complicate later fit-off, and fixing them after the pour is disruptive and costly.
We assess visible signs of ponding, poor falls or water tracking toward the slab area. Managing water at this stage is essential on sloping Tally Ho sites so the slab and base stay dry and stable during construction, reducing the risk of washouts and membrane damage.
Discover why thousands of property buyers trust us with their most important investment.
Professional inspections with attention to every detail. Here's a glimpse of our work.
Inspection photo 1
Inspection photo 2
Inspection photo 3
Find answers to the most frequently asked questions about our inspection service.
Book it for the window after formwork, steel and the vapour barrier are installed, and before the concrete truck arrives. In Tally Ho builds, pours can be scheduled quickly once plumbing and reinforcement are signed off, so it’s best to line up the inspection as soon as you get a likely pour date. We’ll attend pre-pour and report on items that can still be corrected.
Yes. We look for tears, punctures, incomplete laps and poor taping of the vapour barrier, and we pay close attention to detailing around plumbing and service penetrations. These areas are common weak points because trades move across the membrane during setup. If moisture control is compromised, it can lead to damp odours and flooring issues after handover, so we document defects clearly.
It can prevent issues that become expensive once concrete is down: misplaced or poorly supported reinforcement, damaged moisture barriers, questionable formwork stability, and site preparation concerns that can lead to soft spots or uneven bearing. While we’re not doing the engineer’s design work, we identify visible compliance and workmanship defects and provide actionable notes so you can request fixes before the pour proceeds.
Often, yes. Sloping sites can involve cut-and-fill, retaining considerations and more complex drainage paths during construction. If surface water runs toward the slab footprint or the platform isn’t well prepared, membranes can be damaged and the base can soften. A Stage 1 inspection focuses on what’s visible at that moment—levels, water management signs, and workmanship around the slab edge—so problems can be corrected early.
It can. Knockdown-rebuild sites may have remnants of old footings, variable fill, or disturbed ground from demolition and service trenching. That can affect how uniform the slab platform is and how water behaves around the footprint during rain. At Stage 1 we look for visible signs that the site preparation and detailing are consistent and suitable for the pour, then report anything that warrants attention.
Still have questions?